Corporate
website

Photovoltaic power plants

Contrast
Font size - A +

Photovoltaic power plants

Photovoltaics is the second cheapest energy-generating technology, which naturally complements wind energy, among others thanks to a complementary production profile.

Active projects

30 MWp

Capacity of the Photovoltaic Farms in Sulechów

61 ha

Total area of the Photovoltaic Farms in Sulechów

The Sulechów I Photovoltaic Farms are located in Kruszyna, Sulechów commune, Zielona Góra county, Lubuskie Voivodeship. They consist of 8 photovoltaic farms, each with the capacity of ca. 1 MW, with the required infrastructure, and a 15/110 kV substation.

Read more

The Sulechów II Photovoltaic Farm is developed by the Polenergia Farma Wiatrowa 17 Sp. z o.o. special purpose vehicle. The project is located in Kruszyna, Sulechów commune, Zielona Góra county, Lubuskie voivodeship. It consists of twelve photovoltaic installations with a capacity of up to 1 MW each, together with the necessary technical infrastructure. Total power of the farms is 11,7 MWp.

Read more

The Sulechów III Photovoltaic Farm project is developed by Polenergia Farma Wiatrowa Rudniki Sp. z o.o. The project is located in Kruszyna, Sulechów commune, Zielona Góra county, Lubuskie Voivodeship. It consists of nine photovoltaic installations of up to 1 MW each with the necessary technical infrastructure. Total power of the farms is 9,8 MWp.

Read more

The installation was carried out on the premises of Elektrociepłownia Nowa Sarzyna. The project involved the delivery and installation of photovoltaic installations on the ground, on the roofs of buildings (Main Building, Administration Building, Water Supply Station, Auxiliary Boiler Room) on the facade of the Main Building and in the form of dedicated car-ports located in the parking lot. Initial assumptions determined the installed power at the level of about 500 kWp. By using technologically advanced panels, this value has increased to 890 kWp.

Read more

During the construction of the second and third stage of the Sulechów Photovoltaic Farm we used a new type of panel – a double-sided module, thanks to which we will be able to produce more energy. The total capacity of the farms in the three phases is 30 MW. We estimate that annual production from this complex will exceed 32 GWh.
A city the size of Sulechów will be able to be supplied entirely by solar energy.

Development projects

Polenergia plans to launch the Buk Photovoltaic Farms project in 2022. Two photovoltaic projects which received support in the RES auction held in December 2021 – the Świebodzin I PF and the Strzelino PF with a total capacity of 56 MW – are being prepared for construction. Also the Świebodzin II PF project with capacity of 10,5 MWp is ready for construction.

7 MWp

Total capacity of the farms currently built by Polenergia

66 MWp

Capacity of the Photovoltaic Farms being prepared for construction

The Buk Photovoltaic Farm project is carried out by a special purpose vehicle, Polenergia Farma Wiatrowa Rudniki Sp. z o.o. The Buk PF will be located within the village of Wielka Wieś, Buk commune (Poznanski county, Wielkopolskie Voivodeship).

Read more

Wyniki wyszukiwania

Szanowny użytkowniku, w zgodzie z założeniami RODO potrzebujemy Twojej zgody na przetwarzanie danych osobowych w tym zawartych w plikach cookies. Dowiedz się więcej.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close