Mercury CHP
Location: Wałbrzych
Voivodeship: dolnośląskie
Commissioned: July 2006
Total capacity of the facility: 8 MW
The facility has a total capacity of 8 MW and generates steam in a gas-fired boiler, which is then changed into electric energy in a steam turbine set. The Mercury CHP produces energy from coke-oven gas, which is a by-product in production of coke at Wałbrzyskie Zakłady Koksownicze Victoria SA.
The Mercury power plant buys gas and supplies electric energy under contract with WZK Victoria SA, valid until December 2023.